Vendor-neutral microfluidic sensors, meters, valves, and tubing connections MicroCD Labs

Syringe Pumps & Flow Control

Solenoid Valves

Research-use product family; source and production route confirmed by quote.

Quote confirmed
MicroCD Cat. No.
MCD-FC-004
Classification
Syringe Pumps & Flow Control
Subclass
Valves
Catalog source
Confirmed with written quote
Production route
Confirmed for the selected configuration
Order type
Generic research-use family reviewed by written quote

Miniature valves for automated switching, reagent routing, and instrument control.

Switching component for sample injection, routing, recirculation, automation, or flow redirection.

ValveSwitchingAutomation

Catalog status

Research-use product family shown with an indicative catalog range. Source, production route, availability, specifications, final price, tax, shipping, and lead time are confirmed in writing before any order is accepted.

MicroCD Labs uses catalog number MCD-FC-004 for quoting, compatible variants, substitutions, and order review.

Available variants

  • Valve options: 2-way, 3-port, 6-port/2-position, injection, recirculation, sampling, pinch, or bidirectional switching.
  • Drive options: manual, solenoid, controller-driven, or software-automated sequencing.
  • Integration options: tubing/fitting kit, controller pairing, mounting, and assay-specific switching logic.

Specification checklist

  • Confirm intended application: RUO, teaching, prototype, OEM evaluation, or diagnostic development.
  • Confirm fluid compatibility, pressure/flow range, operating temperature, and cleaning method.
  • Define minimum/maximum flow rate or pressure, number of channels, acceptable pulsation, and software-control needs.
  • Confirm power, communication interface, sensor compatibility, tubing/fitting kit, and maintenance requirements.

Documentation and order review

Available specifications, source, production route, and applicable documentation are confirmed with the final written quote.

Quote-reviewed research catalog. Source, production route, specifications, documentation, availability, and final price must be confirmed in writing before an order is accepted.